MICE target phone meeting
23Nov10: 09:00 GMT
Present: CB, PH, PS, EO, KL, JT, EC, BS
1. Review of actions:
- JT, KL: Prepare PDF
reference drawing set for inclusion on target WW site.
Stands.
2. Review of running in R78:
2.1 Latest results: PH, EO
2.2 Discussion: All
- Upbeat! Looks like no significant wear at 600k and
variation in dip-depth satisfactory for MICE;
- Indication of condensation on top flange – to be added to daily
inspection.
3. Progress on mechanical design and fabrication:
3.1 Target assembly [3] and [4]: JT
3.2 Stator development: GB, BS
- GB:
- Had meeting with G.Burton, EC, and GB. Agreed to make a
large meeting to discuss scenarios that arose in the discussion. EC has
made SS stator former. Issues in the machining; maintenance of pitch and
thinness of slots;
- Will produce a cartoon and list of issues unknown to GB.
Then arrange a discission. Goal to do meeting on Monday or Tuesday 29,30Nov10
in DL.
- Discussion:
- Various issues raised. Discussed magnetic modelling.
3.3 Permanent magnet development: PH
3. Target electronics and DAQ: PS, JL
- PS:
- Continuing with design work. BPS cables have now been
run to target rack and connections have been identified;
- Redesign of panels have been implemented;
- Small issue with PS board: larger gauge of copper has
meant that the soldering is difficult. Being looked at by JL.
4. Target paper: CB
- Present draft can be accessed from:
- http://mice.iit.edu/bl/Target/index.html
5. Next meeting
- Wednesday
01Dec10 14:00 with inspection close out
- Target w/s before Christmas:
- RAL:
PH to suggest date to coincide with 2M dips
6. AoB
Summary of actions
- JT, KL: Prepare PDF
reference drawing set for inclusion on target WW site.
- PH: Suggest date for
target w/s.