MICE target phone meeting
13Apr11: 09:00 GMT
Present:
Phone details: here
1. Review of actions:
·
GB, PH: Work with WS on chiller purchase
·
PH: Complete write up of complete
inspection.
·
PH: Install shielded USB cable to
protect target PC in R78 from electrical noise
2. Review of running in R78 and inspection: PH, EO
3. Progress on mechanical design and fabrication:
3.1 Target assembly [3] and [4]: JT
3.2 Stator development: EC, GB, BS
3.3 Permanent magnet development: PH
3. Target electronics and DAQ: PS
4. Target paper: CB
- Present draft can be accessed from:
- http://mice.iit.edu/bl/Target/index.html
§
Combine short writing w/s on 13Mat11.
5. Next meeting
- 20Apr11;
09:00 phone call
- 13May11;
MICE/ISIS target w/s
6. AoB