| Wednesday Feb 9 |
| Design and safety review working group (71B-290) |
| 09:00-10:30 |
Outline of the Design & Safety Review | P. Drumm |
| Results of the dry run on Beamline Design & Safety audit | P. Drumm/W. Lau |
| Format of the documentary audit | W. Lau |
| 10:30-11:00 | Coffee |
| 11:00-12:30 | Schedules for Phase 1 deliverable audits | W. Lau |
| Discussion & suggestions on the proposed audit framework | All |
| 12:30-14:00 | Lunch |
| Beam and Optics (71B-290) |
| 14:00-15:30 |
MICE Target Development | L. Howlett |
| Target/Beamline diagnostics | K. Walaron |
| Recent beamline design work & plans | K. Tilley |
| Discussion | |
| 15:30-16:00 | Coffee |
| 16:00-18:00 |
Beamline Engineering/Installation | P. Drumm |
| Discussion | All |
| Tracker: KEK test beam (71-264) |
| 14:00-15:30 |
Overview | K. Yoshimura |
| Beam line simulation | K. Sakai/K. Yoshimura |
| Tracker | G. Barber |
| Waveguide | M. Yoshida |
| TOF/Aerogel | A. Horikoshi |
| 15:30-16:00 | Coffee |
| 16:00-18:00 |
Trigger counter | A. Bross/K. Yoshimura |
| Cryostat/cryocooler | R. Rucinski |
| AFEII status | P. Rubinov |
| DAQ | M. Yoshida |
| Tracking simulation | K. Yonehara |
| Discussion | K. Long |
| 18:30-... | Silwood Park group meeting (71-264) |
| Wednesday --
Thursday --
Friday --
Saturday --
Sunday
|
| Thursday Feb 10 |
| Plenary: General (Perseverance Hall) |
| 09:00-09:05 | Welcome | J. Siegrist |
| 09:05-09:30 | Welcome/aim of meeting | M. Zisman |
| 09:30-10:00 | Project manager's report | P. Drumm |
| Plenary: Optics and Beamline (Perseverance Hall) |
| 10:00-10:30 | Summary of beamline parallel session | K. Tilley |
| 10:30-11:00 | Coffee |
| 11:00-11:30 | MRI Spectrometers & Step V.0 and other optics issues | U. Bravar |
| 11:30-11:50 | Spectrometer solenoid: design and cost update | M. Green |
| 11:50-12:15 | Discussion on Optics and MRI magnets | K. Long, All |
| 12:15-13:30 | Lunch |
| Plenary: Simulation (Perseverance Hall) |
| 13:30-14:00 | Simulation Overview | Y. Torun |
| Tracker (Perseverance Hall) |
| 14:00-15:30 |
Mechanical design review |
| Mechanical design details | G. Barber |
| QA | P. Kyberd |
| Phase 1 |
| Possible layout | G. Barber |
| Magnet fall-back options & implications | Discussion |
| 15:30-16:00 | Coffee |
| 16:00-18:00 |
Electronics |
| AFE II (t) | A. Bross |
| AFE II (t) to VME (LVDS board) |
| VLPC cryostat - issues for full sytem |
| DAQ architecture | E. Gschwendtner |
| Tracker DAQ | M. Yoshida |
| Software - issues for production system | M. Ellis |
| Action items | K. Long |
| AFC Module (2-100B) |
| 14:00-15:30 |
Hydrogen system R&D | E. Baynham |
| Absorber R&D | S. Ishimoto |
| Discussion on R&D and action list | |
| 15:30-16:00 | Coffee |
| Infrastructure and Safety (2-100B) |
| 16:00-18:00 |
Powering for coils & quench protection | M. Green |
| Forces in MICE | Y. Ivanyushenkov/E. Baynham |
| Force reaction analysis | S. Yang |
| Support structure & railing arrangement | E. Baynham |
| Discussion on force reaction scheme and action list | |
| Discussion on Final Design and Safety Review | M. Zisman (convener) |
| Particle Identification (Perseverance Hall - Addition) |
| 14:00-15:30 |
Update on G4BEAM beam rates, profiles, losses at detector locations | T. Roberts |
| Implementation of TOF detectors in G4MICE | S. Kahn |
| Implementation of CKOV I & II |
| Implementation of MuCal in G4MICE | R. Sandström |
| 15:30-16:00 | Coffee |
| 16:00-18:00 |
Update & plans on CKOV I | L. Cremaldi |
| Short news from TOF and MuCal | V. Palladino |
| Mag shield and CKOV II | G. Gregoire |
| Realistic drawings of PID detectors in the general MICE layout | W. Lau |
| 18:00-... | Technical Board (Perseverance Hall-Addition) |
| Wednesday --
Thursday --
Friday --
Saturday --
Sunday
|
| Friday Feb 11 |
| Plenary: Simulation (Perseverance Hall) |
| 09:00-09:30 | Tracking and Cooling in G4MICE | C. Rogers |
| 09:30-10:00 | Physics in G4MICE | R. Sandström |
| 10:00-10:30 | Coffee |
| 10:30-12:00 |
General seminar: A. Blondel
Future Neutrino Oscillation Experiments:
Superbeam, Betabeam and Neutrino Factory -- a European Perspective
|
| 12:00-13:00 | Lunch |
| 13:00-13:30 | PID Simulation and analysis in G4MICE | M. Ellis/A. Fish |
| 13:30-14:15 | Simulation and performance of sci-fi tracker | M. Ellis |
| 14:15-14:45 | Discussion on Simulation | All |
| Plenary: Control, Monitoring and DAQ (Perseverance Hall) |
| 14:45-15:05 | Parameter list | E. Gschwendtner |
| 15:05-15:25 | Beam line Controls, Monitoring and DAQ | P. Drumm |
| 15:25-15:55 | Coffee |
| 15:55-16:15 | Cooling channel CM&D | M. Zisman |
| 16:15-16:45 | Tracker CM&D | M. Yoshida |
| 16:45-17:15 | PID detectors CM&D | V. Palladino |
| 17:15-17:45 | Discussion on Controls, Monitoring and DAQ | All |
| 18:00-... | Collaboration Board (Perseverance Hall) |
| Wednesday --
Thursday --
Friday --
Saturday --
Sunday
|
| Saturday Feb 12 |
| Plenary: Safety (Perseverance Hall) |
| 09:00-09:30 | MICE hall layout | P. Drumm/Y. Ivanyushenkov |
| 09:30-10:00 | Cooling channel layout | W. Lau |
| 10:00-10:30 | Forces and reaction scheme proposal | E. Baynham |
| 10:30-11:00 | Coffee |
| 11:00-11:30 | AFC module safety | S. Ishimoto |
| 11:30-12:00 | RF module safety | S. Virostek |
| 12:00-12:30 | Summary of safety issues | W. Lau |
| 12:30-13:00 | Discussion & action list | All |
| 13:00-14:00 | Lunch |
| Plenary: General (Perseverance Hall) |
| 14:00-14:15 | CB summary | D. Kaplan |
| 14:15-14:45 | Tracker summary | M. Yoshida |
| 14:45-15:15 | PID summary | V. Palladino |
| 15:15-15:45 | AFC module summary | W. Lau |
| 15:45-16:15 | Coffee |
| 16:15-15:45 | RFCC module summary | D. Li |
| Rf R&D for MICE | J. Norem |
| 17:15-18:00 | Wrap up and discussion | A. Blondel |
| 19:30-... | Collaboration Dinner |
| Wednesday --
Thursday --
Friday --
Saturday --
Sunday
|
| Sunday Feb 13 |
| 09:00-11:00 | Executive Board (71-264) |