MICE Tracker Workshop, 6-8 November 2006
Physics Dept, Imperial College London - Monday 6 & Wednesday 8
Rutherford Appleton Laboratory - Tuesday 7
Location:
Imperial: Room 532 or 539, on Level 5,
Blackett (No. 7 on the South Kensington Campus map) Nearest underground: Gloucester Rd or South Kensington Stations.RAL: R76 G06
General Information:
Directions to the South Kensington campus can be found at http://www.imperial.ac.uk/research/hep/about/travel.htm
Directions to Rutherforld Appleton Laboratory can be found at http://www.cclrc.ac.uk/Activity/RALMAPS;
Accommodation:
-
Please book through
http://www.imperial.ac.uk/conferences/index.asp?page_id=27
-
See also these links:
The Brompton Hotel,
Aston Apartments,
The Regency Hotel.
- List of local Pubs around South Kensington.
-
Please book through
http://www.imperial.ac.uk/conferences/index.asp?page_id=27
Contact:
-
Imperial:
Takashi - Room 514 Blackett, +44 (0)20 7594 7796
-
RAL:
MICE office - R1 2.45, +44 (0)1235 445 646
-
Imperial:
Programme: Minutes
-
Monday, 6 November 2006 - Imperial
- 10:00 Session 1: Station 5 and tracker Mechanical -
Blackett 532
Chairs: T.Matsushita/G.Barber -
- Introduction K. Long
- station5; carbon fibre frame and cmm/connectors/shipping box G. Barber
- station5; assembly/QA status, schedule T. Matsushita
- station5; waveguides M. Yoshida
- station5; cosmic test A. Bross
- 13:00 lunch
- 14:00 Session 2: KEK analysis and software -
Blackett 539
Chairs: M.Ellis/M.Yoshida -
- Report on Osaka analysis (M. Yoshida for H. Sakamoto) H. Sakamoto
- Report on Imperial Analysis A. Fish
- Software status and plans M. Ellis
- Discussion All
- 18:00 Adjourn
- 19:30 Dinner VODKA
- 10:00 Session 1: Station 5 and tracker Mechanical -
Blackett 532
-
Tuesday, 7 November 2006 - RAL
- 10:00 Session 3: Integration and installation -
R76 G06
Chairs: C.Nelson/G.Barber -
- Update on the Mice hall layout C. Nelson/T. Jones
- Tracker Layout and installtion requirements G. Barber
- Tracker - interface with the solenoid, alignment G. Barber
- Lead absorber + interface with solenoid & tracker W. Lau/S. Yang
- Real Estate requirements in the hall Everyone
- Solenoid Services requirements C. Nelson
- Space/requirements for tracker in the local control room T. Hart
- 13:00 lunch
- 14:00 Session 4: Electronic and DAQ -
R76 G06
Chairs: T.Hart/C.MacWaters -
- Firmware updates I T. Hart
- Firmware updates II S. Galegadera
- VLSB/LVDS development for MICE TBC
- MICE scheme for increased data processing rate T. Hart
- VLSB for Station 5 tests TBC
- 18:00 Adjourn
- 10:00 Session 3: Integration and installation -
R76 G06
-
Wednesday, 8 November 2006 - Imperial
- 10:00 Session 5: Project management and discussion -
Blackett 532
Chairs: K.Long/A.Bross -
- Schedule All
- Risk register All
- Response to review All
- Next workshop and phone meetings All
- Discussion All
- 13:00 lunch
- 14:00 Session 6: Cryogenic system and status and plans for tracker fabrication -
Blackett 532
Chairs: T.Matsushita/A.Bross -
- cryo status A. Bross
- carbon fibre station frame/spacing frame and jig G. Barber
- waveguides for full tracker M. Yoshida
- doublet-layers for full tracker A. Bross
- station assembly/QA, schedule for full tracker T. Matsushita
- station acceptacne rig M. Takahashi
- 18:00 Adjourn
Speakers can upload talks here
See below for connection details for afternoon sessions.Dial-in numbers: (Inside the U.K.) 0871 271 2900 (Outside the U.K.) +44 (0)870 050 6800 Enter the meeting code 786572 when prompted.
- 10:00 Session 5: Project management and discussion -
Blackett 532
-
Monday, 6 November 2006 - Imperial