Agenda:

Minutes of meeting - Ken
  1. KEK analysis status and plans: Hideyuki, Aron
  2. Software status: Malcolm, Aron
  3. Preparations for station five:
    • At FNAL: Alan
    • In UK:
      • Manufacture of mechanical parts (go-no-go gauges etc.): Geoff
      • Preparation for construction; bundling and connectorisation QA: Takashi
      • Preparation of station acceptance rig: Maiko
    • In Japan: Makoto
  4. Layout in MICE Hall: Geoff
  5. Electronics:
  6. Cryo status: Alan
  7. Response to MICE Review: All
  8. Discussion of risk register: All
  9. Schedule: All
  10. AoB: All

Speakers can upload talks here
See below for connection details.

Date: Friday, Sep 8, 2006
Time: 13:00 GMT

Dial-in numbers:
(Inside the U.K.) 0871 271 2900
(Outside the U.K.) +44 (0)870 050 6800
Enter the meeting code 201023 when prompted.

Takashi Matsushita - Sep 6, 2006