Tracker Meeting, 26 Aug 2008
Agenda: minutes
- 0. Actions from last meeting:
- Specify stations to be used for tracker #2: James
- Status of build of installation components: Geoff
- Check of installation of diffuser 'top-hat' into patch panel.
- Crown is available and padded and first carbon-fibre mast is glued. Flexible joints will be assembled tomorrow.
- Frame for construction of tracker will be assembled.
- B-field monitoring brackets available. Will do when install in solenoid.
- Require to make O-rings.
- Helium services have been requested, will remind TH after the shutdown.
- Send LED pulser back to FNAL: CMacW
- Status of slow control: Hideyuki/James
- See CMacW's notes from last week.
- 1. Status of cosmic test of tracker #1: ME/CMacW
- 2. Mechanical:
- Status of build of tracker #2: Geoff
- 3. Status of final station QA: James
- 4. DAQ/Slow control:
- 5. NIM paper:
- WWW page for comunication and outline: Ken
- TRD update: status/progress
- 6. Cost/schedule to complete tracker module review:
- 7. DONM
- 02Sep08: 13:30 GMT