Tracker Meeting, 22 Sep 2009
Agenda: minutes
- Status of MICE Note on cosmic test of tracker #1 LC
- Cosmic test of trackers #1 and #2 in Lab7 CMacW/ME
- Mechanical: GB
- Hall probes and liaison with F.Filthaut
- Helium window
- Radiation shield
- DAQ/Slow control:
- Spectrometer solenoid update ABr
- NIM paper: KL
- TRD update: All
- DONM:
- Discussion: frequency of meetings, the set next date
- AoB: