Agenda for Tracker Meeting - 12 January 2010, 14:30 GMT ======================================================= Present: ABr, DA, KL, RG, GB, PK 0. Review of actions - ME: Document the storage of the QA data as a MICE Note that will be linked from the tracker/documentation link. - Stands. - GB/ME: Write MICE Note on tracker CMM and confirmation with cosmic data. - Stands. - GB/RH: Prepare plan for servicing of cold heads, compressors, and vacuum pumps. - Stands: - GB and RH have discussed. Will prepare plan with ABr next week. - ABr: Check copyright. - Done. - ABr: Seek successfor to TH - P. Rubinov and T. Fitzpatrick. So done. - PK: Check Forster reference. - Done. 1. Tracker paper: efficiency analysis DA - See slides. - DA will present tracker poster at Vienna. - DA agreed to try and undertand calculation and then prepare summary to go through with KL, ME, et al when ready (next week?) 2. Discussion of overview of steps in preparation All of tracker for installation - Start cryo servicing as soon as we can. - Mechanical plan: can be prepared -- GB has added his piece to TH plan. Need to review plan once TH has produced his plan -- perhaps next tracker meeting. - Readout integration: Outstanding work is to integrate tracker #1 and #2 readout. Agreed to start work on readout integration as soon as paper is done and servicing is complete. 3. Next meeting: - 26Jan10 3. AoB - None. -------- Kept for the 'corporate memory' -------- 1. Status of MICE Note on cosmic test of tracker #1 LC 2. Mechanical: GB - Hall probes and liaison with F.Filthaut: - Helium window: - Radiation shield: 4. DAQ/Slow control: - Status of r/o of firmware etc. TH - Date DAQ DA 5. Spectrometer solenoid update ABr 6. NIM paper: 7. TRD update: All 8. DONM: * CM25 9. AoB