Tracker Meeting, 12 Jan 2010
Agenda: minutes
- Review of actions
- ME: Document the storage of the QA data as a MICE Note that will be linked from the tracker/documentation link.
- GB/ME: Write MICE Note on tracker CMM and confirmation with cosmic data.
- GB/RH: Prepare plan for servicing of cold heads, compressors, and vacuum pumps.
- ABr: Check copyright.
- ABr: Seek successfor to TH
- PK: Check Forster reference.
- Tracker paper: efficiency analyis DA
- Discussion of overview of steps in preparation of tracker for installaion All
- Next meeting:
- 26Jan10
- AoB:
--- Kept for the 'corporate memory' ---
- Status of MICE Note on cosmic test of tracker #1 LC
- Mechanical: GB
- Hall probes and liaison with F.Filthaut
- Helium window
- Radiation shield
- DAQ/Slow control:
- Status of r/o of firmware etc. TH
- DATE DAQ DA
- Spectrometer solenoid update ABr
- NIM paper: All
- TRD update: All
- DONM:
- CM25
- AoB: