Tracker Meeting, 26 September 2011
Agenda: minutes
- Actions:
- CMacW: List of things to check if Auto Dialler calls.
- EO: Consider digitizing ISIS clock during December run.
- KL: Implement barriers appropriately in Lab7.
- Cosmic test and h/w status in Lab7:
- Mechanical update: GB
- He window.
- LED system.
- Hall probe fixtures.
- In abeyance.
- R/o status: DA,EO,PR
- Slow control status: MR
- Software status: ES
- Next meeting:
- Phone call Monday 03Oct11; 15:00 BST
- Tracker w/s: 15/16 December 2011 at RAL.
- Points for the next tracker workshop:
- Items to be collected here until we make the agenda for the w/s
- Specification of slow control system for the tracker;
- Tracker s/w;
- Where do we want to run the tracker; i.e. both in beam and out;
- Installation and maintenance.
- AoB and summary of actions.