Tracker Meeting, 14 October 2011
Agenda: minutes
- Actions:
- CMacW: List of things to check if Auto Dialler calls.
- EO: Consider digitizing ISIS clock during December run.
- CMacW: Valve on cryostat needs replacing after accident.
- KL: to talk with Rob Harper et al to try and understand and fix the issue with mousehole and to discuss longer term solution. For example, Bastion0.
- EO: restart automatic data transfer.
- Cosmic test and h/w status in Lab7:
- Mechanical update: GB
- He window.
- LED system.
- Lead energy filter swap.
- Hall probe fixtures.
- In abeyance.
- R/o status: EO, PR, DA
- Slow control status: MR
- Software status: ES
- Next meeting:
- Phone call Monday 21Nov11; 15:00 GMT
- Tracker w/s: 15/16 December 2011 at RAL.
- Points for the next tracker workshop:
- Items to be collected here until we make the agenda for the w/s
- Specification of slow control system for the tracker;
- Tracker s/w;
- Where do we want to run the tracker; i.e. both in beam and out;
- Installation and maintenance.
- Items to be collected here until we make the agenda for the w/s
- AoB and summary of actions.