Tracker Meeting, 5 December 2011
Agenda: minutes
- Actions:
- CMacW: List of things to check if Auto Dialler calls.
- EO: Consider digitizing ISIS clock during December run.
- CMacW: Valve on cryostat needs replacing after accident.
- KL: Organise meeting at DL on tracker controls.
- AD, CR, KL: Fix next steps for OL on handling of geometry in MAUS.
- OL: Complete description of Geometry tables at Excel level for transmission to M. Littlefield.
- Cosmic test and h/w status in Lab7:
- Mechanical update: GB
- He window.
- LED system.
- Lead energy filter swap.
- Hall probe fixtures.
- R/o status: DA,EO,PR
- Slow control status: MR
- Software status: DA, ES, OL
- Next meeting:
- Tracker controls DL: 12Dec11.
- Tracker w/s: 15/16 December 2011 at RAL.
- Points for the next tracker workshop:
- Items to be collected here until we make the agenda for the w/s
- Specification of slow control system for the tracker;
- Tracker s/w;
- Where do we want to run the tracker; i.e. both in beam and out;
- Installation and maintenance.
- "Station 4" run in the MICE Hall
- Items to be collected here until we make the agenda for the w/s
- AoB and summary of actions.