Tracker Meeting, 5 December 2011



Agenda: minutes
  1. Actions:
    • CMacW: List of things to check if Auto Dialler calls.
    • EO: Consider digitizing ISIS clock during December run.
    • CMacW: Valve on cryostat needs replacing after accident.
    • KL: Organise meeting at DL on tracker controls.
    • AD, CR, KL: Fix next steps for OL on handling of geometry in MAUS.
    • OL: Complete description of Geometry tables at Excel level for transmission to M. Littlefield.
  2. Cosmic test and h/w status in Lab7:
    • Hardware status: DA,CMacW
    • Progress of cosmic run: ES
  3. Mechanical update: GB
    • He window.
    • LED system.
    • Lead energy filter swap.
    • Hall probe fixtures.
  4. R/o status: DA,EO,PR
  5. Slow control status: MR
  6. Software status: DA, ES, OL
  7. Next meeting:
    • Tracker controls DL: 12Dec11.
    • Tracker w/s: 15/16 December 2011 at RAL.
  8. Points for the next tracker workshop:
    • Items to be collected here until we make the agenda for the w/s
      • Specification of slow control system for the tracker;
      • Tracker s/w;
      • Where do we want to run the tracker; i.e. both in beam and out;
      • Installation and maintenance.
      • "Station 4" run in the MICE Hall
  9. AoB and summary of actions.

Speakers can upload talks here

Date: Monday, 5th December 2011
Time: 15:00 GMT

Connection details:
The four digit company id: 4673 (callers from outside the UK); and
The pin number: 419357
Dial-in numbers are available here.

Edward Santos - 5th December 2011