Tracker Meeting, 16 January 2012
Agenda: minutes
- Actions:
- CMacW: Valve on cryostat needs replacing after accident.
- AD, ES, CR: List of mods to do before commit of code to spacepoints to KL.
- AD, ES: Commit to spacepoints by the end of the week.
- ES, AD: Split out unpacking/calibration of data in a separate mapper.
- ML, ES, OL, AD, KL: Urgent to add description of the geometry and complete the coordinate system description to the tracker s/w write up.
- CMacW and GB: revise cryostat orientation and check light-guide routing.
- CMacW: Propose present autodialer system to online group and suggest as the standard for MICE if other systems want them.
- DA, EO: Collaborate on specification of block diagram for delay and distribution of ISIS RF and trigger.
- ABr: Consult re spare VLPC cassettes from D0 as MICE spares.
- DA, ABr: Make plan for implementation of DAQ in Hall.
- KL: Prepare for review of schedules in tracker parallel.
- Particle trigger relationship to ISIS clock: EO
- Cosmic test - status of analysis: ES
- Preparations for single station test in the MICE Hall:
- Software status: AD, ES, PK, OL
- Snagging list:
- Zero suppression, implies calibration etc.;
- Automation of data transfer in Lab7;
- Sort out events with empty data from one or other tracker;
- MC responsible person becomes Paul Kybert; need list of jobs;
- Handling of ISIS RF in MICE Hall;
- Implementation of integration window, clock etc. in the MICE Hall;
- Distribution/scheme for handling detector "busy" signals in the MICE Hall;
- Add check sum or other data integrity token to r/o.
- Schedule review
- We need to schedule this.
- Next meeting:
- Tracker phone call: 27Feb12
- Next Tracker workshops:
- Work-in starting 01May12
- AoB and summary of actions.