MICE Software Workshop

June 5-7, 2006 -- Fermilab

         Organizer: Malcolm Ellis

         Registration: Please register using this form and make sure you indicate what days you can attend and any specific discussion you would like to participate in if you can't be present through the whole workshop. You can see a list of registered people here

         Computing: Wireless network access is available in the meeting room, please see details on the Collaboration Meeting page.

         Location: The Software workshop will be held in WH9SE

         Accommodation: please see details on the Collaboration Meeting page.


Attendance: Malcolm Ellis, Aron Fish, Ben Freemire, Jean-Sebastien Graulich, Terry Hart, Takashi Matsushita, Chris Rogers, Hideyuki Sakamoto, Rikard Sandstrom, Yagmur Torun, Michael Wojck, Makoto Yoshida


Goals:

1.      Software for KEK test beam analysis

2.      Continued development of and use of MiceModules system.

3.      Design work towards upgrade of field map utilities

 


 

Progress

 

Task

Sub-Task

Person

Date

Tag or Link

MiceUnits

Implement MiceUnits code and add to MiceRun

Chris

5th June

 

Modify MiceModules to use MiceUnits

Chris

6th June

 

Modify dataCards to use MiceUnits

Chris

5th June

 

Simulation

Fix problem in SciFiSD/DetModel (missing hits in some planes)

Malcolm and Yagmur

5th June

 

Add G4UserLimits to MiceModules and Simulation

Malcolm

5th June

 

Add Aerogel material to Simulation

Rikard and Jean-Sebastien

5th June

 

Add Aerogel material to MiceModule file for KEK ACC

Rikard and Jean-Sebastien

5th June

 

Add volume to KEK description to allow rotation of solenoid

Aron

6th June

 

Add fixed field to MICEDetectorConstruction

Malcolm

5th June

 

Test fixed field implementation using KEK 1T solenoid

Malcolm

5th June

 

Add average momentum option to Simulation

Malcolm

6th June

 

Define KEK beams to be simulated

Aron, Makoto and Malcolm

6th June

 

Simulate KEK beams, generating TOF and SciFi hits

Malcolm

6th June

 

Digitisation

Check SciFi Digitisation

Malcolm

7th June

 

Add datacards needed for TOF Digitisation

Aron and Rikard

7th June

 

Implment correct TOF Digitisation

Aron and Rikard

7th June

 

Digitise KEK beams

 

5th June

 

Reconstruction

Implement TofCalib code

Aron

5th June

 

Produce TofCalib data file

Aron

5th June

 

Use TofCalib in TofDigits

Aron

5th June

 

Implement time walk correction code for TOF

Aron and Malcolm

8th June

 

Produce timewalk correction data file

Aron and Malcolm

8th June

 

Add time determination code for TofSlabHits

Aron

7th June

 

Add time determination code for TofSpacePoints

Aron

7th June

 

Improve position determination for TofSlabHits

 

5th June

 

Update TofSpacePoint to use better position in TofSlabHits

 

5th June

 

Check TOF resolution plots from TofSlabHits and TofSpacePoints

Aron

7th June

 

Check TofSpacePoint resolution in Simulation

 

5th June

 

Implement VlpcCabling code

Takashi

7th June

 

Produce VlpcCabling data files for KEK test beam

Takashi

7th June

 

Check CMN subtraction in SciFi

Malcolm

9th June

 

Check cluster reconstruction in SciFi

Malcolm

9th June

 

Upgrade space point reconstruction in SciFi

Malcolm

9th June

 

Check alignment (views in a station and stations in the tracker)

Malcolm

9th June

 

Implement MiceModules in Kalman initialisation code

Malcolm

9th June

 

Test Pattern Recognition and track fit in Simulation

 

9th June

 

Analysis

Prepare KekOct2005 application with Ntuple

Aron and Malcolm

10th June

 

Run sample data set to check NTuple

Malcolm

10th June

 

Process KEK data

Malcolm

10th June

KekAnalysis_20060610

MiceModules

Check MICE stages 1 VI

Ben and Mike

6th June

 

Implement Hep3Vector option in MiceModules

Malcolm and Aron

5th June

 

Implement more detailed Tracker (taking KEK as an example)

Ben and Mike

6th June

 

Implement more detailed TOF0

Rikard

6th June

 

Implpement more detailed TOF1

Rikard

6th June

 

Implement more detailed TOF2

Jean-Sebastien

6th June

 

Implement more detailed EmCal

Ben and Mike

7th June

 

Implement more detailed AFC

Ben, Mike & Terry

7th June

 

Implement more detailed RFCC

Ben, Mike & Terry

7th June

 

Implement coils in Tracker Solenoid

Ben & Mike

9th June

 

Design

Prepare design for field maps

Chris, Yagmur & Malcolm

6th June

Note from Chris

Implement planned changes to use MiceModules for non uniform fields

Chris

7th June