Technical Board

Muon Ionisation Cooling Experiment

Old Technical Board page

Membership:

A. Nichols (chair), A. Blondel, A. Bross, J. Cobb, D. Colling, G. Hanson, W. Lau, K. Long, T. Hayler, P. Hanlet, M. Zisman

Mail to the Technical Board.

Meetings:

         Technical Board:
The agenda and notes of the MICE Technical Board meetings are posted here.
 

         MICE Schedule Planning meetings (Wednesdays, 13:30, R76 G06):
The agenda and notes of the MICE Schedule Planning meetings are posted here.
Mail to the MICE-Hall list.
 

         MICE Hall Planning meetings (discontinued):
The agenda and notes of the MICE Hall Planning meetings are posted here.
Mail to the MICE-Hall list.

Reviews:

         MICE CC Cryostat Design Review (29Feb12 and 01Mar12):
Agenda

         MICE Hydrogen System Pre-Operation Safety Review (04Oct11):
Agenda.

         MICE RF power distribution system production readiness review (date TBD):
Directory created as place holder, here.

         Spectrometer solenoid review (November 2009):
The review page is located here.

         RFCC design review (October 2008):
The notes on the review are posted here.

         LH2 review: (October 2008):
The conclusions of the review are posted here.

         RF power review: (October 2008)
The conclusions of the review are posted here.

         Diffuser review (October 2007):
The conclusions of the diffuser design review are posted here.

         MICE Muon Beam review (16Nov07):
The papers and presentations prepared for the MICE Muon Beam review are posted here.

         MICE decay solenoid review (03Mar09):
The papers and presentations prepared for the MICE decay solenoid review are posted here.

MICE WBS and schedule (work in progress):

The schedule for the various tasks which make up the MICE project being developed in the following directory tree: MICE-WBS-Schedule.

Meetings to review/discuss MICE WBS and Schedule: here

MICE drawing repository (work in progress):

The drawings for MICE are collected in the following directory tree. The directory tree follows that developed for the schedules (i.e. the WBS). The drawing repository is under development in the following directory tree: MICE-Drawings.

Importation:

Importations from outside the EU must be accompanied by appropriate paperwork.  The paperwork for the various importations are collected in the following directory tree: Importation

 

MICE Project Manager: A. Nichols