MICE Technical Reference

This version of the technical reference will be frozen at CM13. The version in edit form will be available "here".

SectionSub
Section
Title Contains...Authorversion D&S Audit
i   Cover page  --
ii   Table of contents  --
iii   Collaboration List  --
1   Introduction

...[ToC]

- - -
2   The Conceptual Design of MICE

...[ToC]

- - -
  02.01 Objectives of the MICE experiment

...[ToC]

- - -
  02.02 Overview of the MICE design

...[ToC]

- - -
  02.03 Measurement Technique

...[ToC]

- - -
  02.04 Measurements, beam dynamics and performance

...[ToC]

- - -
3   Simulation

...[ToC]

- - -
  03.01 Overview

...[ToC]

- - -
  03.02 Code Development Infrastructure

...[ToC]

- - -
  03.03 G4MICE Features

...[ToC]

- - -
4   The Magnetic Channel and the MICE Magnets

...[ToC]

- - -
  04.01 The Magnetic Channel and the MICE Magnets

...[ToC]

- - -
  04.02 Design of Coils

...[ToC]

- - -
  04.03 Focusing Magnet

...[ToC]

- - -
  04.04 Coupling Magnet

...[ToC]

- - -
  04.05 Tracker Solenoid Magnet

...[ToC]

- - -
  04.06 Cooling the magnets and the use of closed cycle coolers

...[ToC]

- - -
  04.07 Magnetic Measurements

...[ToC]

- - -
5   The MICE RF System

...[ToC]

- - -
  05.01 Cavity and Coupling Coil Module

...[ToC]

- - -
  05.02 RF Power System

...[ToC]

- - -
  05.03 Cavity Radiation

...[ToC]

- - -
6   The Absorber and Focus Coil Module

...[ToC]

- - -
  06.01 Introduction

...[ToC]

- - -
  06.02 Liquid-hydrogen Absorbers

...[ToC]

- - -
  06.03 Focusing Coil

...[ToC]

- - -
  06.04 Force Management

...[ToC]

- - -
  06.05 Cooling the Magnet and Absorber with Cryocoolers

...[ToC]

- - -
  06.06 Absorber Design Details

...[ToC]

- - -
  06.07 The Window Tests

...[ToC]

- - -
  06.08 Window seals

...[ToC]

- - -
  06.09 Control & Instrumentation

...[ToC]

- - -
  06.10 QA requirements

...[ToC]

- - -
  06.11 Cool-down of the absorber

...[ToC]

- - -
  06.12 OPERATIONAL Procedures

...[ToC]

- - -
7   The MICE Muon Beam Line

...[ToC]

- - -
  07.01 Introduction

...[ToC]

- - -
  07.02 ISIS Proton Beam Structure

...[ToC]

- - -
  07.03 MICE Target at ISIS

...[ToC]

- - -
  07.04 Beamline Design

...[ToC]

- - -
  07.05 Expected Performance

...[ToC]

- - -
  07.06 Beam Line Vacuum System

...[ToC]

- - -
  07.07 MICE Beam Diagnostics

...[ToC]

- - -
  07.08 Controls

...[ToC]

- - -
  07.09 Interference with ISIS

...[ToC]

- - -
  07.10 Schedule

...[ToC]

- - -
8   Detectors

...[ToC]

- - -
  08.01 Overall description, functionality and redundancy

...[ToC]

- - -
  08.02 Scintillators for timing, trigger and upstream PID.

...[ToC]

- - -
  08.03 Upstream Cherenkov detector for p-m-e separation revised 2006-07-12 - - - -
  08.04 Tracker module

...[ToC]

- - -
  08.05 The Downstream Region (To be revised)

...[ToC]

- - -
  08.05.01 The magnetic shield

...[ToC]

- - -
  08.05.02 Beam characteristics in the downstream region and constraints for the detectors

...[ToC]

- - -
  08.05.03 Downstream TOF2 detector

...[ToC]

- - -
  08.05.04 The downstream Cherenkov (Kept for information)

...[ToC]

- - -
  08.05.05 The electromagnetic calorimeter (EMCAL) (to be revised).

...[ToC]

- - -
  08.06 DAQ, trigger, on-line monitoring

...[ToC]

- - -
  08.07 Safety

...[ToC]

- - -
9   Layout and Infrastructure

...[ToC]

- - -
  09.01 Hall layout

...[ToC]

- - -
  09.02 Radiation Shielding

...[ToC]

- - -
  09.03 Magnetic Shielding

...[ToC]

- - -
  09.04 Magnetic forces

...[ToC]

- - -
  09.05 Support Structure

...[ToC]

- - -
  09.06 Infrastructure and services

...[ToC]

- - -
  09.07 Hydrogen System

...[ToC]

- - -
  09.07.02 R&D Hydrogen Delivery System

...[ToC]

- - -
  09.08 Electrical Power and Cooling Water

...[ToC]

- - -
  09.09 Vacuum system

...[ToC]

- - -
  09.10 Controls Infrastructure

...[ToC]

- - -
  09.11 Civil Engineering

...[ToC]

- - -
  09.12 Safety

...[ToC]

- - -
10   Controls Instrumentation and Monitoring

...[ToC]

- - -
  10.01 A Possible Concept

...[ToC]

- - -
11   Safety Issues

...[ToC]

- - -
  11.01 Safety Issues

...[ToC]

- - -
  11.02 Hydrogen Safety

...[ToC]

- - -
  11.03 Radiation from the Synchrotron

...[ToC]

- - -
  11.04 Cavity X-ray production and shielding

...[ToC]

- - -
  11.05 Magnetic Fields

...[ToC]

- - -
  11.06 Cryogenic Safety

...[ToC]

- - -
  11.07 Engineering Systems

...[ToC]

- - -
  11.08 Safety Plan

...[ToC]

- - -
  11.09 RAL Safety Codes

...[ToC]

- - -
12   Quality Assurance, Control and Monitoring

...[ToC]

- - -
  12.01 Quality Assurance and QA Monitoring

...[ToC]

- - -
  12.02 Quality Control and Quality Assurance Procedures

...[ToC]

- - -
13   The MICE WBS

...[ToC]

- - -
14   Summary

...[ToC]

- - -
15   References

...[ToC]

- - -